Workheld Flow Web App for Coordinators (EN)
Workheld 10.0
Workheld Flow Web (Coordinators)
Welcome to this short introduction to Workheld.
We will show you in a few steps how you can use Workheld
to improve your assembly, service and maintenance processes!
Part 1: Welcome to Workheld
1.1 Workheld Flow Web App in the browser
The Workheld Flow Web App can be accessed at flow.workheld.com with any modern internet browser. You can find the list of officially supported browsers here.
1.2 Login to Workheld
When you open the Workheld Flow web app for the first time, you will be taken directly to the login page.
You should have already received your login details by email.
1.3 The main menu
The main menu of the Workheld Flow web app is divided into six sections. You also have access to your own profile, the language settings and the help area at the top right of the menu bar.
OVERVIEW
Status overview
In the status overview, you can view the status of projects, assignments and standing orders and are informed about defects and delays.
Daily dashboard: In this dashboard you can see the current assignments, downtimes of the systems and the employees who are present in the current shift.
Reports: In "reports" you can view the aggregated daily working and travelling times of the selected technician for a specific week and export them as required
WORK
Projects
Here you can create, manage and finalise projects and add the associated employees, equipment and tools. You will also find all the documentation created by the technicians in the course of carrying out projects.Cases
Here you can create, manage and finalise assignments and add the corresponding employees, equipment and tools. You will also find all the documentation created by the technicians in the course of carrying out assignments.Standing orders
Here you can create, manage and finalise standing orders and add the associated employees, equipment and tools. You will also find all the documentation created by the technicians in the course of executing standing orders.Maintenance Notifications: Here you can view an overview of all received maintenance notifications.
Unassigned entries: These are maintenance reports, for example, because they cannot be directly assigned to an order.
Team planner: In the team planner, you can assign your projects and assignments to employees in a weekly overview.
SCHIFT MANAGEMENT
Shift planner: You can plan shifts here.
Shift Infoscreen: Here you can view the most important shift information, such as the personnel assigned for the week and their availability.
Work time models In this overview you can see all shift models that include shifts.
Team Shifts: Here the user can assign different working time models per day to the team, and also determine which job profiles are needed per day and shift.
Schicht calender definitionen: Here you can define the period from when to when your team shifts are valid.
EQUIPMENT
Equipment management
Here you can create and manage assets in the field.Equipment planner: Here you can move orders horizontally in terms of time.
Maintenance Plan: Here you can view all maintenance activities of the assets for the selected period and generate projects.
MATERIAL
Material management
Here you can create and manage replacement, consumable and assembly materials.Material orders
Here you can view material orders and process them further.Stock overview
Here you can view the current material stock in total or by individual employee.
MASTER DATA
Customers
Here you can create new customers or edit existing customers.Checklisten
Here you can create new checklists or edit existing checklists.Werkzeuge
Here you can create new tools or edit existing tools.Project templates
You can edit existing project templates here.Execution Groups: Here you can view an overview of the execution groups and edit them.
PERSONAL MANAGEMENT
Skills
Here you can view the professional skills required to carry out certain jobs or work.
Qualifications
Here you can view the professional skills that have been acquired via certificates. A qualification becomes a certificate as soon as it is assigned to an employee.
Jobprofiles
Here you can see the combination of important professional skills that lead to a specific job profile, e.g: Automation technician.
Worker
Technicians are the workers who can log into the mobile apps to carry out their work. Workers are also technicians who are only employed by the company on a short-term basis via a leasing company.
Absence requests
As a coordinator, you can approve or reject absence requests from technicians here.
1.4 Breadcrumbs
Throughout the Workheld Flow web app, breadcrumbs are displayed directly below the main menu to help you find your way around and allow you to easily navigate back to the start page or to other levels.
In the following example, you are currently in the view of a work order with the title "Auftrag1" and you can see from the breadcrumbs that this work order is in the project "Projekt1".
In addition to the breadcrumbs, you can also use the practical BACK TO... button to navigate back one step at any time.
1.5 Object bar
In some places in the Workheld Flow web app, the object bar is displayed on the right-hand side. It is used to assign employees, attachments and tools to a work order, a work step or an attachment using drag & drop.
The object bar is divided into 4 areas via a table bar:
TECHNICKER | EQUIPMENT | TOOLS | SKILLS |
|---|
In the TECHNICKER area, all employees with the user type Project coordinator or Technician are displayed and you can assign them to a work step or the entire work order using drag & drop. You can add new employees or edit existing employees in the main menu under → TECHNICKER management.
All of the customer's equipment are displayed in the EQUIPMENT section and you can assign them to a work step or the entire work order using drag & drop. You can add new attachments or edit existing attachments in the main menu under EQUIPMENT → Equipment management.
In the TOOLS area, all tools are displayed and you can assign them to a work step or the entire work order using drag & drop. You can add new tools or edit existing tools in the main menu under MASTERDATA → Tools.
In the SKILLS area, all skills are displayed and you can assign them to a work step or the entire work order using drag & drop. Using the magic wand button, the appropriate technicians are automatically selected based on the skills.
1.6 User settings
You can customize your name, profile picture and password in the Workheld Flow Web App.
To do this, click on your user name at the top right and then on Profile.
1.7 Passwort
You can change your password at any time in the user settings by clicking on the RESET PASSWORD button in your profile.
1.8 Language
You can also change the language of the Workheld Flow web app at any time. To do this, click on the country abbreviation next to the globe in the top right-hand corner and select the desired language.
Part 2: Overview
2.1 Status overview
In the status overview, all open projects, cases and standing orders are displayed in a status board. You can use the table bar to switch back and forth between projects, cases and standing orders.
Individual projects, cases or standing orders are displayed as small cards in the status overview. In addition to the name and ID, these also contain information about the customer and the start and end time.
If a start or end date is shown in red in the status overview, the project, case or standing order is overdue! If, for example, the end time of a project is shown in red in the IN PROGRESS status, the project should already be completed on the current date.
If technicians have created defect entries in the course of their work, you will receive a small note on the small cards.
Depending on which tab you are in, you can create new projects, cases and standing orders directly from the status overview. For example, if you are in the project tab, simply click on the ADD NEW PROJECT button.
2.2. Daily dashboard
The daily dashboard is located under 'Overview'. This dashboard brings together all data relevant to the day.
The current standstills (planned or unplanned) of the systems
Current faults on the systems
Current shift with list of workers present
The dashboard contains a button with a function to open a kiosk view. The kiosk view also shows the current time and today's date. The lists run automatically without the user having to interact with the screen.
2.3 Reports
Among all reports, you can view the project effort report, the weekly report and the material consumption report.
2.3.1 Project effort report
In the project effort report, you can see how much effort the projects have caused in a particular month. At the top left, you can navigate through the months. In this view, the projects are differentiated according to their status: Draft, Set up and Completed.
Icon | Name | Description |
|---|---|---|
| Active travel time | resulting from trip entry (who drove) |
Working time | resulting from time entry |
2.3.2 Weekly report
In the weekly report, you can view the aggregated daily working and travel times of the selected technician for a specific week and export the report if required. In this view, you have the option to view the weekly report for each technician, but you must first select the relevant employee at the top.
The current week is displayed right here, but it is possible to jump forwards or backwards one calendar week using the forward and back buttons.
Icon | Name | Description |
|---|---|---|
| Passive travel time | resulting from travel entry (who traveled with you) |
| Active travel time | resulting from trip entry (who drove) |
Arbeitszeit | resulting from time entry |
2.3.3 Material consumption entry
Here you can view a summary and a complete list of materials used within the selected accounting period. To do this, you should set the start and end dates of the reporting period, allowing you to view information across different departments. Report can be exported as a summary or just 1 report.
Part 3: Work
Before you can create projects, cases or standing orders, you must create a customer. You can find more information under: EN_Part 6: Masterdata
3.1 Creating and managing projects
3.1.1 List of Projects
Navigate to WORK → PROJECTS in the main menu.
Here you will find a list of all open projects. You also have the option of displaying completed projects by pressing the INCLUDED COMPLETED toggle button.
You can navigate from here to the project overview of an existing project by clicking on the small arrow on the right-hand side of the line.
You have the option of sorting the list of projects by ID, name and project period. You can also use the search function to find a specific project.
3.1.2 Creating projects
Create a new project by clicking on the ADD NEW PROJECT button at the top right of the list of projects.
The following fields are available when creating a project:
Field | Description | Mandatory field |
Project | Name of a project | Yes |
Customer | Assigned customer of the project | Yes |
Responsible coordinator | Responisble coordinator of a project | No /automatic |
Department | Department in which the project is implemented | Yes |
Project number | Number of a project | No |
Category | Category of a project | No |
Rank | Rank of a project | No |
Target state | Target state | No |
Project ID | Identification number of a project | Yes* |
Description | Description of a project | No |
Start | Beginning of the expected project period | No |
End | Ending of the expected project period | No |
*If you leave this field blank, it will be filled with an automatically generated value.
Press SAVE after adding all relevant information. You can edit the project again at any time later.
3.1.3 Project overview
After you have created a new project, you will automatically be taken to the project overview. You can also navigate to the project overview of an existing project from the list of projects by simply clicking on it.
3.1.4 Project overview section Project information
In the project overview, all information about the project is displayed in the top section. You can see the current status of the project at a glance using the status bar in the project title.
3.1.5 Project Overview Section List of Work Orders
The lower section is divided into 3 areas using a tab bar:
PREPARATION | DOCUMENTATION | EXPORT |
|---|
In the PREPARATION area you will find a list of the work orders in the project. From here you can navigate to the work order overview of an existing work order by clicking on the small arrow at the right edge of the row.
In the DOCUMENTATION area you will find all entries, documents and reports created by the technicians while working on the project. Click on the respective entry, document or report icon on the right to view them.
You have the option to filter by entry type or use search to find a specific entry.
In the EXPORT area you have the option of exporting travel and working time entries as well as documents and reports created by the technicians while working on the project.
3.2 Creating and managing cases
3.2.1 List of cases
In the main menu, navigate to WORK → Cases.
Here you will find a list of all open assignments. You have the option to also view completed bets by pressing the INCLUDED COMPLETED toggle button.
From here you can navigate to the deployment overview of an existing deployment by clicking on the small arrow on the right edge of the line.
You have the option to sort the list of operations by ID, name and time of occurrence. You can also use the search to find a specific application.
3.2.2 Creating the cases
Create a new case by clicking on the ADD NEW CASE button at the top right of the list of inserts.
When creating a case, you also have the option of selecting an attachment and immediately creating a solution step. You can find further information under: Teil 3 Work | 3.2.3 Creating case with equipment and work step
The following fields are available when creating a case:
Field | Description | Mandatory field |
Case | Name of a case | Yes |
Customer | Assigned customer of the case | Yes |
SLA | Service level | No |
Case ID | Identification number of a case | Yes * |
Work order category | Category of a work order | No |
Rank | Rank of a workorder | No |
Anrufer | Caller for the work order | No |
Target state | Target state of a workorder | No |
Date of occurence | Time when the problem has happened | No |
Description | Description of a work order | No |
Responsible Coordinator | Coordinator who is responsible for the order | No / Automatic |
Department | Department in which the work order is carried out | No |
Category | Case category | No |
Priority | Priority level | No |
Phone | Phone number of a caller | No |
Address | Address field with search in Google Maps | Yes |
Name | Name of the order address (e.g. company, town, landmark) | Automatic |
Latitude/Longitude | Latitude/longitude of the order address | Automatic |
Address | Automatically filled formatted order address | Automatic |
Country | Automatically filled country of the order address | Automatic |
Additional Address Information | Additional information on the order address (e.g. entrance gate) | No |
*If you leave this field empty, it will be filled with an automatically generated value.
Press SAVE once you have added all the relevant information. You can edit the project again later at any time.
3.2.3 Creating case with equipment and work step
When creating a case, you can already select the relevant equipment by selecting it from the drop-down menu at the top left. If you have selected an equipment, the location of the equipment is automatically adopted as the order address and a work step is added to the case.
You now have the option of saving the case without a work step. In this case, the case is created as normal and only the address of the selected equipment is copied.
However, you can also add a work step to the case, whereby the following fields are available to you:
Field | Description | Mandatory field |
Work Step Titel | Name of a work step | Yes |
Work Step ID | Identification number of a work step | Yes* |
Description | Description of a working step | No/ Copy of the case |
Start Date and Time | Start of the planned work | No |
End Date and Time | End of the planned work | No |
If you add a work step to the task, the description of the task is automatically copied to the work step. If you deactivate the "Copy the work step description from the task" toggle button or fill in the field, the description is not copied.
3.3 Creating and managing standing orders
3.3.1 List of standing orders
In the main menu, navigate to WORK → STANDING ORDERS.
Here you will find a list of all open standing orders. You also have the option of displaying completed standing orders by pressing the INCLUDED COMPLETED standing orders toggle button.
You can navigate from here to the overview of an existing standing order by clicking on the small arrow on the right-hand side of the line.
You have the option of sorting the list of standing orders by ID, name or validity period. You can also use the search function to find a specific standing order.
3.3.2 Creating standing orders
Create a new standing order by clicking on the ADD NEW STANDING ORDER button at the top right of the standing order list.
The following fields are available when creating a standing order:
Field | Description | Mandatory field |
Standing order | Name of the standing order | Yes |
Customer | Assigned customer of the standing order | Yes |
Standing order ID | Identification number of the standing order | Yes* |
Standing order category | Category of the standing order | No |
Rank | Rank of the standing order | No |
Target status | Target status | No |
Accounting reference | Information or reference to accounting | No |
Description | Description of the standing order | No |
Responsible Coordinator | Coordinator responsible for the standing order | No / Automatic |
Departments | Department in which the standing order is to be executed | No |
Valid from | Start of the validity period | Yes |
Valid until | End of the validity period | Yes |
*If you leave this field empty, it will be filled with an automatically generated value.
Press SAVE after you have added all the relevant information. You can edit the standing order at any time at a later date.
3.3.3 Standing order overview
Once you have created a new standing order, you will automatically be taken to the standing order overview. You can also navigate to the overview of an existing standing order via the list of standing orders by simply clicking on it.
3.3.4 Standing order overview Section Standing order information
In the standing order overview, all information about the standing order is displayed in the top section. The status bar next to the standing order title shows you the current status of the standing order at a glance.
3.3.5 Standing order overview section List of work orders
The lower section is divided into 3 areas using a table bar:
PREPARATION | DOCUMENTATION | EXPORT |
|---|
In the PREPARATION area, you will find a list of the work orders in the standing order. You can navigate from here to the work order overview of an existing work order by clicking on the small arrow on the right-hand side of the line.
In the DOCUMENTATION section, you will find all entries, documents and reports created by the technicians in the course of working on the standing order. Click on the respective icon for entries, documents or reports on the right-hand side to display them.
You have the option of filtering by entry type or using the search function to find a specific entry.
In the EXPORT area, you have the option of exporting travel and working time entries as well as documents and reports created by the technicians in the course of their work on the project.
3.4 Creating and managing work orders
3.4.1 Creating work orders
Create a new work order for a project or a standing order by clicking on the ADD NEW WORK ORDER button in the project overview. Please note that this button is only displayed if you are in the PREPARATION area of the table bar.
The following fields are available when creating a work order:
Field | Description | Mandatory field |
Work order | Name of the work order | Yes |
Work order ID | Identification number of the work order | Yes* |
Descritpion | Description of the work or | No |
Address field | Address field with search in Google Maps | Yes |
Name | Name of the work order address (e.g. company, town, landmark) | Automatic |
Latitude/longitude | Latitude/longitude of the order address | Automatic |
Address | Automatically filled formatted order address | Automatic |
Country | Automatically filled country of the order address | Automatic |
Additional address information | Additional information about the order address (e.g. entrance gate) | No |
*If you leave this field empty, it will be filled with an automatically generated value.
Press SAVE once you have added all the relevant information. You can edit the work order again at any time at a later date.
You can fill in the address fields by searching for locations, addresses or landmarks. To specify the exact location on a large industrial site, for example, you can move the pin on the map.
3.4.2 Work order overview
Once you have created a new work order, you will automatically be taken to the work order overview. You can also navigate from the project overview to the work order overview by simply clicking on it.
All information about the work order is displayed in the top section of the work order overview. The status bar in the order title allows you to see the current status of the work order at a glance.
3.4.3 Work order overview Section Order information
In the upper section of the work order overview you will find a table bar, which is divided into 3 areas:
SUMMARY | LOCATION | DOCUMENTS |
|---|
In the SUMMARY area, you will see a list of all technicians, equipment and tools that are already assigned to at least one of the work steps in the work order. If you click on the small X symbol that is displayed next to the respective technicians, systems or tools, these are removed from all work steps.
In the ORDER ADDRESS area, the order address is displayed on a map.
In the DOCUMENTS area, you can attach any number of documents to the work order. These documents are made available to all technicians who have been assigned to the order.
You can attach documents to the work order by either dragging them to the Documents area or by clicking on the DOWNLOAD button and then selecting the desired documents.
Workheld supports all common file formats up to a size of 20 MB. It is possible to activate additional file formats. Contact us at support@workheld.com or create a request here for more information.
3.4.5 Work order overview section List of work steps
The lower section of the work order overview is divided into 3 areas using a table bar:
PREPARATION | DOCUMENTATION | EXPORT |
|---|
In the PREPARATION area, you will find a list of the work steps in the work order. From here, you can open and edit each individual work step in a separate window by clicking on the small pencil on the right-hand side of the line.
In the DOCUMENTATION area, you will find all entries, documents and reports created by the technicians in the course of working on the work order. Click on the respective icon for entries, documents or reports on the right-hand side to display them.
You have the option of filtering by entry type or using the search function to find a specific entry.
In the EXPORT area, you have the option of exporting travel and working time entries as well as documents and reports created by the technicians in the course of working on the work order.
3.5 Creating and managing work steps
3.5.1 3.5.1 Creating work steps
Create a new work step for the work order by clicking on the ADD NEW WORK STEP button in the work order overview. Please note that this button is only displayed if you are in the PREPARATION area of the table bar.
The following fields are available when creating a work step:
Field | Description | Mandatory field |
Work step Title | Name of the work step | Yes |
Work step number | Number of the work step | No |
Planned working time | Planned setup time, working time, teardown time | No |
Urgent order | Should the order be completed as soon as possible | No |
Description | Description of the work step | No |
Start date and time | Start of the planned work | No |
End date and time | End date and time | No |
*If you leave this field empty, it will be filled with an automatically generated value.
Press SAVE once you have added all the relevant information. You can edit the step at any time at a later date.
3.5.2 Planning and sorting work steps
You can specify the start date and time as well as the end date and time when you create a work step and can of course also edit this information when you edit the work step.
You also have the option of setting the start date and time as well as the end date and time for all work steps at once by clicking on the SCHEDULE button. Then set the start date and time as well as the end date and time and click SAVE.
The function for planning all work steps is set so that the changes are only applied to those work steps that are not yet planned, i.e. have neither a start nor an end date. If you deactivate the "Only apply to unplanned work steps" toggle button, the changes are applied to all work steps!
You also have the option of changing the sorting of the work steps by clicking on the SORT button and then selecting the option to sort by start time, work step ID, creation time or work step title.
You also have the option of simply dragging and dropping individual work steps up or down.
The selected sorting of the work steps is also displayed to the assigned technicians - it is therefore advisable to sort the work steps in the order in which they should be processed.
3.6 Assigning checklists
You can assign a checklist to a work step by clicking on the checklist icon in the respective work step in the lower section of the work order overview in the PREPARE tab.
A new window will then open, showing you all the available checklists in the left-hand bar. Click on the desired checklist and confirm your selection with the ASSIGN button.
You can change or remove the assignment of a checklist as long as the work step is not yet IN WORK or COMPLETED. To do this, simply click on the checklist icon in the respective work step again.
If a work step has the status IN PROGRESS or DONE, a checklist can no longer be assigned and an existing checklist can no longer be changed or removed.
3.7 Assigning employees
You can assign one or more employees to a work order by dragging the desired employee from the object bar onto the work order overview.
Alternatively, you can drag the employee to an individual work step in the lower section to assign the employee to this one work step only.
If you assign an employee to a work order, this employee is assigned to all the work steps currently available for this work order.
You can remove the assignment of an employee to a work order by clicking on the X symbol next to the employee in the SUMMARY tab in the upper section of the work order overview.
Using the small green circles next to the employees, you can see how many work steps of the work order the employees are assigned to.
3.8 Assigning attachments in the field
You can assign an attachment to a work order by dragging the desired attachment from the object bar onto the work order overview.
Alternatively, you can drag the attachment to an individual work step in the lower section. You can only assign one attachment per work step!
Wenn Sie eine Anlage einem Arbeitsauftrag zuordnen, wird diese allen gegenwärtig vorhandenen Arbeitsschritten dieses Arbeitsauftrag zugeordnet.
You can remove the assignment of an attachment to a work order by clicking on the X symbol next to the attachment in the SUMMARY tab in the upper section of the work order overview.
Using the small green circles next to the system, you can see how many work steps of the work order the systems are assigned to.
3.9 Assigning tools
You can assign a tool to a work order by dragging the desired tool from the object bar onto the work order overview.
Alternatively, you can drag the tool to an individual work step in the lower section.
If you assign a tool to a work order, it is assigned to all currently available work steps of this work order.
You can remove the assignment of a tool to a work order by clicking on the X symbol next to the tool in the SUMMARY tab in the upper section of the work order overview.
The small green circles next to the tool show you how many work steps of the work order the tools are assigned to.
3.10 Assigning material lists
You can assign a material list to a work step by clicking on the material symbol in the respective work step in the lower section of the work order overview in the PREPARE tab.
A new window will then open showing you all available materials in the left-hand bar. You can search for the desired materials in the search bar above the left-hand bar.
Once you have found the desired material, you can add it to the material list by clicking on the PLUS symbol. You can repeat this process as often as you like to add all the desired materials to the list.
The current material list is displayed in the right-hand bar of the window. You can change the quantity of the individual materials there or delete a material from the list by clicking on the garbage can next to the respective material.
Please note that the material lists can no longer be adjusted once the work step has the status IN PROGRESS, COMPLETED or COMPLETED.
3.11 Applying project templates
You can also fill a new project from a project template by navigating to the desired project in the WORK → PROJECTS area and clicking APPLY TEMPLATE.
Please note that the new project must be completely empty in order to fill it with a template. If a work order has already been created in the project, no template can be applied.
If you click on APPLY TEMPLATE, the template wizard opens and displays all available templates in the list on the left. Click on the desired template and confirm your selection with the NEXT button.
You have the option of selecting and deselecting individual work orders for the template.
In the next step of the template wizard, you will be asked to enter an order address. This address is assigned to all work orders in the project template. If the work orders in the project require different addresses, you can adjust them accordingly afterwards.
After you have entered an order address, click on the SAVE button to apply the selected template to the new project.
3.12 Maintenance Notifications
In the overview of maintenance notifications, all recorded notifications are displayed in a table view. Both open and completed maintenance notifications are shown centrally.
Each maintenance notification is displayed as a row and includes information such as creation date, title, linked projects, notification type, creator, and current status. Status indicators make it immediately clear whether a notification has been submitted, is in progress, or has been completed.
Using the search function and filter bar, you can narrow down maintenance notifications by date, customer, asset, or notification type and quickly find relevant entries.
By selecting one or more notifications, additional actions such as closing notifications can be performed. New maintenance notifications can be created directly using the CREATE MAINTENANCE NOTIFICATION button.
Clicking the eye icon opens the detail view of a maintenance notification and allows you to view further information.
3.13 Unassigned entries
Entries that are not assigned to work steps are referred to as “unassigned entries”. Typically, entries can be created by technicians as they are assigned to work items. Otherwise, they have no other option.
There are 2 scenarios:
Scenario 1:
A technician can create a maintenance notification. This is a maintenance message (IH message) in the system, a kind of “defect entry” where you could report that something is wrong. This message remains as an entry without assignment. It is possible to create a maintenance notification without being assigned to a work step.
Scenario 2:
It could happen that a coordinator creates a work item, a work order, and a work step and assigns it to a technician. The technician synchronizes his app and starts work. Suddenly the coordinator deletes the project in the web app. At the same time, the technician has already created entries but not yet synchronized them. From the coordinator's point of view, it is not known whether the technician has started work. If this situation occurs, it will result in the entry remaining unallocated after synchronization.
The " Unassigned entries" area is divided into two parts: Documentation and Export. On the left side, the coordinator can switch between entries, documents, images and reports.
On the left side of Documentation, the coordinator can switch between:
Entries:
Documents and images:
and reports:
In this area at the top right, the coordinator can filter the entries and documents and also finalize selected ones. Depending on the configuration of the Workheld platform, these entry types are available for selection:
Icon | Bezeichnung |
|---|---|
Defect entry | |
Travel entry | |
Expense entry | |
Working time entry | |
Measured value entry | |
Material Consumption Entry |
In the EXPORT area, you have the option of exporting travel and working time entries as well as documents and reports created by the technicians in the course of their work on the project.
3.14 Team planner
The team planner allows you to assign projects and cases to technicians and move them along the timeline. The team planner also gives you a general overview of the technicians' workload.
Although standing orders are displayed in the team planner, they cannot be assigned.
When you open the team planner, the current working week is automatically displayed. Alternatively, you can also display the calendar in a monthly view. You can navigate forwards or backwards one calendar week or month at a time using the arrow buttons at the top left.
3.14.1 Assignment to technicians
The bottom bar shows you all projects and cases that are planned for the week currently displayed but have not yet been assigned to at least one technician. Assign these to a technician by simply dragging and dropping the projects or cases vertically onto one of the technicians.
You can also assign projects and cases to several technicians by simply moving them from one technician to another.
If you want to remove the assignment of a technician to a project or case, simply right-click on the project or assignment and select the option REMOVE ASSIGNMENT.
If you remove the assignment of a project or cases from a technician and it is the only technician who was assigned, an orange notification appears in the top left-hand corner. If other technicians are still assigned to the project or assignment, the notification is displayed in blue.
3.14.2 Moving projects and assignments
You can also move projects and cases horizontally using drag & drop and thus change the scheduling. Please note that all times stored in the work steps will be moved according to your selection.
In the monthly view, projects and cases are each shifted by one day. In the weekly view, you can also move the projects and cases by a few hours.
3.14.3 Processing projects and cases in Team Planner
By double-clicking on a project or case, a pop-up window appears that also allows you to edit the assigned technicians and change the start date and thus the entire schedule.
To edit the project or insert in more detail, simply right-click on the project or insert and select the OPEN DETAIL VIEW option.
Part 4: Shift Management
4.1 Shift planner
The shift planner is located under the 'Schift Management' menu. Once a department has been selected, the currently active configured calendar is automatically loaded with this department. The workers can be assigned to the respective shifts using drag and drop.
4.1.1 Fixed View
The fixed view of the shift calendar displays the planned shifts exactly as they are defined in the shift calendar configuration.
The assignment of assets, workers, and shifts is static and is based solely on the predefined calendar data.
Changes to orders or job profiles do not automatically affect the display.
This view is particularly suitable for showing the originally planned target state of shift planning.
You can define the number of required employees when creating team shifts or edit the existing number of employees.
Assigned employees can be removed from the shift or defined as shift leaders using drag and drop or via right click.
The variable view additionally takes dynamic factors into account, such as current production orders and job profiles. For it to function correctly, certain prerequisites must be met:
Completed and planned shift calendar definition: The shift calendar must be fully defined and planned.
Relevant production orders in the system: All required production orders must be maintained in the system.
Job profiles for assets: The job profiles of the assets must be maintained and up to date.
Job profiles for workers: Both the main job profile and alternative job profiles of the workers must be fully and correctly maintained.
If this data is not maintained correctly, the variable view cannot function properly.
The variable view is particularly suitable for displaying the actual demand and deployment possibilities of workers and assets depending on the existing orders.
4.1.3 Copy Function in Shift Planner
The copy function is used to efficiently transfer already planned shift assignments to other days or weeks. This allows recurring shift patterns or identical schedules to be created quickly and without errors.
With this function, a planned day can be copied to multiple other days within the same week.
Alternatively, an entire week including all shift assignments can be copied to multiple subsequent weeks.
Step 1: Click on “Copy assignment”
Step 2: Select the desired copy type (day or week) and choose the target days or weeks.
Click on “Execute copy”.
Step 3: After the copy process is completed, a popup window appears showing the following information:
Which persons are absent on the selected target days or weeks.
Which persons are already scheduled on those days or weeks.
4.1.4 Publishing Function
The publishing function ensures that all stakeholders only see the officially released shift calendar. This creates transparency and increases planning reliability.
Responsibility: Every shift planner has the ability to publish the shift calendar. Coordinators can rely on the fact that employees only see the actually published calendar.
Publishing a draft: Once editing of the calendar is complete, the shift planner clicks on “Publish draft”. This saves and makes visible a published version.
Published view: After publication, shift planners or coordinators can use the “Published” button to see when the latest version was released. In this view, changes can also be made if required.
Switching back to draft mode: By clicking on “Draft”, the view switches back to edit mode. Further adjustments can be made there without them being immediately visible to everyone.
Note:
Publishing ensures that employees always see only the valid latest version of the shift plan. Changes made in draft mode remain invisible until they are published again.
4.2 Shift Info Screen
The Shift Info Screen is used to clearly display the shift schedule for employees. It can be used as a kiosk view to show the current schedule and the following weeks in real time.
Process:
Select the desired department using the filter.
Set the display speed for the info screen.
Click on “Kiosk View”.
The kiosk view then opens in a separate window.
Functions of the kiosk view:
The top bar shows the selected department, the current date, the current time, and the calendar week.
The current week and the following two weeks are always displayed.
After the first displayed week has elapsed, the view automatically advances, ensuring a rolling three week overview.
After completing the cycle, the display automatically returns to the current week.
Note:
The Shift Info Screen is ideal for providing employees with a transparent and up to date overview of their shifts at all times, for example via information screens within the company.
4.3 Work time models
In order to be able to plan shifts, some settings must be made in advance. These include the creation of a shift model. There are companies with 1-shift operation, or companies with 3-shift operation. Some have a mixture.
In this overview you can see all the work time models that contain shifts. You can expand these models to see the shifts they contain.
4.3.1 Creating a work time model
After the user has clicked on the "Create create work model" button, this window appears. It contains three areas:
Entering the details of the working time model:
ID (optional): is alternatively generated automatically
Working time model name (mandatory field)
Status: is always active or inactive
The creation of shifts after clicking on the 'Add shift' button:
Name of the shift (mandatory field)
Break (in min) (mandatory field)
Start time (mandatory field)
End time (mandatory field)
State
Summary:
Work time model
Shifts
After confirming, the new working time model with the created shifts is displayed in the overview.
On the one hand, it is possible to edit the details of the working time model, but also to edit, delete or add new shifts.
4.4 Team shifts
Team shifts are literally the allocation of the working time model with the included shifts to the individual departments. Here, the user can assign different working time models per day to the team, and it must also be determined which job profiles are required per day and shift.
4.4.1 Create a team shift
ID (optional): alternatively generated automatically
Name (mandatory field)
Department (mandatory field)
Work time model (mandatory field)*As soon as the department and working time model have been selected, a matrix appears in which you can enter the number of job profiles
Weekday (mandatory field)
State: always active or inactive
Shift manager required: determines whether a shift supervisor is required for this shift on this particular day
Assign qualifications: There are shifts where a person with a first aider certificate or a fire safety officer must always be present.
Info: the number of job profiles is only intended as an aid for future shift and resource planning in the shift planner.
4.4.2 Detailed view of team shift
Team shifts can also be edited. However, if a different department or a different working time model is selected, the matrix is regenerated and must be refilled.
4.5 Shift Calendar Definitions
We have now reached the last step before shift planning. The user must now define the period from when to when their team shifts are valid.
4.5.1 Create shift calendar definition
ID (optional): is alternatively generated automatically
Name (mandatory field)
State: always active or inactive
First day of calendar view (mandatory field)
Start date (mandatory field)
End date (mandatory field)
Department (mandatory field))
After clicking on "Add team shifts":
Select team shifts per day
4.5.2 Detailed view of Shift Calendar Definition
Shift calendar definitions can be set to inactive or deleted as long as they have not yet been planned in the team planner.
Part 5: Equipment
5.1 Equipment management
In the main menu, navigate to EQUIPMENT→ EQUIPMENT MANAGEMENT.
All equipments are displayed here in a list and you can navigate from here to the detailed view of the individual equipments by clicking on the small arrow on the right-hand side of the line.
You have the option of sorting the list of equipment by equipment number, name and equipment status. You can also use the search function to find an equipment.
5.1.1 Creating equipment
You can create new equipment by clicking on the ADD NEW EQUIPMENT button at the top right of the list of equipment.
The first step is to enter the general data for the new equipment. The following fields are available:
Field | Description | Mandatory field |
Component type | Type of components | Yes |
Customer | Customer of the equipment | Yes |
Equipment name | Name of the equipment | Yes |
Equipment status | Status of the equipment | Yes |
Equipment number | Identification number of the equipment | Yes* |
Serial number | Serial number of the equipment | No |
Equipment description | Description of the equipment | No |
*If you leave this field empty, it will be filled with an automatically generated value.
Press NEXT after you have added all the relevant information.
In the next step, you can add additional information about the equipment. The following fields are available:
Field | Description | Mandatory field |
Date of last maintenance | Date when the last maintenance was carried out | No |
Maintenance interval (in months) | Time interval for maintenance | No |
Tolerance (in months) | Tolerance in months for maintenance | No |
Press NEXT after you have added all the relevant information.
In the next step, you can add contact and address information to the equipment. The following fields are available:
Field | Description | Mandatory field |
Address search | Address field with search in Google Maps | No |
Name | Name of the equipment location (e.g. company, town, landmark) | Automatic |
Latitude/longitude | Latitude/longitude of the order address | Automatic |
Address | Automatically filled formatted order address | Automatic |
Country | Automatically filled country of the order address | Automatic |
Additional address information | Additional information about the order address (e.g. entrance gate) | No |
Press SAVE after you have added all the relevant information. You can edit the equipment again at any time in the future.
5.1.2 Detailed view of equipment
Once you have created a new piece of equipment, you are automatically taken to the detailed view of the equipment. You can also navigate to the detailed view of an existing equipment via the list of equipment by simply clicking on it.
5.1.3 Equipment overview section Equipment information
In the detailed view of the equipment, all information about the equipment is displayed in the top section. The operating status in the order title also allows you to see at a glance whether there is currently any outstanding work for the equipment.
You can navigate back to the CUSTOMER OVERVIEW using the BACK TO CUSTOMER OVERVIEW button.
5.1.3 Equipment overview Operating data section
The lower section is divided into 4 areas using a table bar:
EQUIPMENT DETAILS | EQUIPMENT STRUCTURE | ROJECTS / CASES / STANDING ORDERS | DOCUMENTATION |
|---|
In the EQUIPMENT DETAILS section, you can download an automatically generated QR code for the equipment, view additional system information and assign a technician by simply dragging them from the object bar on the right-hand side onto the highlighted field.
In the EQUIPMENT STRUCTURE you will find a hierarchical representation of the components of a piece of equipment. The higher-level equipment can be understood as equipment that comprises numerous components. These components are also recorded in the system and are connected to the main equipment.
Under PROJECTS / INSERTIONS / PERMANENT ORDERS you will find a list of all projects, inserts and standing orders to which the equipment has been assigned. You can navigate to the overview of a project, assignment or standing order by simply clicking on it.
Under DOCUMENTATON you will find all entries that were created by the technicians in the course of working on the equipment.
You have the option of filtering by entry type or using the search function to find a specific entry.
5.2 Equipment planner
The equipment planner can be found under 'Equipment-> Equipment planner'. An installation can be selected. Once the system has been selected, the planned projects for this system appear on the timeline. As long as the project date has not been fixed, it is possible to move the projects on the Planner.
Double-click on the project to open a small window. The start and end date can be set in this window. You can also click on the boxes for 'Confirmed date' and 'Fixed date'. A fixed project can then no longer be moved in the timeline.
You can use the 'Add standstill' button to create planned or unplanned standstills in the timeline for the equipment.
5.3 Maintenance Plan
Navigate in the main menu to EQUIPMENT→ MAINTENANCE PLAN.
In this view, all assets and subnodes are displayed. After selecting a date range, the information stored in asset management regarding the last maintenance, the maintenance interval, and the tolerance is shown.
It is important to complete the maintenance information for the equipment, as this data serves as the basis for the maintenance plan and will be displayed in the list according to the maintenance date.
5.3.1 What do all fields mean?
If the data has been set up correctly, you can generate orders. This feature allows you to save time by adding predefined and previously created project templates with a single click. An order is then created that is suitable for the respective maintenance task.
Once the maintenance order is completed, the maintenance date is updated automatically. The equipment is then no longer displayed in the maintenance plan and will only appear again when the next maintenance is scheduled.
Part 6: Material
6.1 Material management
In the main menu, navigate to MATERIAL→ MATERIAL MANAGEMENT.
All materials are displayed here in a list and you can navigate from here to the detailed view of the individual materials by clicking on the small arrow on the right-hand side of the line.
6.1.1 Creating a material
You can create a new material by clicking on the ADD NEW MATERIAL button at the top right of the list of materials.
The following fields are available when creating a material:
Field | Description | Mandatory field |
Material number | Identification number of the material | Yes |
Unit | Unif of a material | Yes |
Material type | Defines the use of the material. Can be inventory managed or non inventory managed. | Yes |
Material status | Availability of the material | Yes |
Material title | Name of the material | Yes |
Material description | Description of the material | No |
Press SAVE after you have added all the relevant information. You can edit the material again at a later date at any time.
6.1.2 Detailed view of material
Once you have created a new material, you are automatically taken to the detailed view of the material. You can also navigate to the detailed view of an existing material via the list of materials by simply clicking on it.
You can navigate back to the MATERIAL OVERVIEW by clicking the BACK button.
To edit a material, click on the EDIT button - you will then be redirected to the same view that you are already familiar with from creating a new material.
Materials cannot be deleted. However, you have the option of setting the material status to INACTIVE if a material is no longer available.
6.1.3 Material types
There are three material types in Workheld that can be used in different ways:
Material type | Availability Check | Ordering material | Reservation status | Material consumption entries |
|---|---|---|---|---|
Inventory Managed | Yes | Order from work order and inventory via avaliabilty check | Reservable | Yes |
Non Inventory Managed | No | Order from work order | Not reservable | Yes |
Inventory managed materials are materials that are counted and assigned to storage locations. These storage locations are maintained in the Admin Client by a person with the necessary permissions. Material consumption entries can be created for these types of materials, but before they are added to a consumption entry, an availability check is performed to ensure that sufficient materials are present in the storage locations. This allows the technician to see not only the available quantity but also the exact locations of the materials.
Non inventory managed materials are materials that are not tracked in the system and cannot be reserved. When creating a material consumption entry, no availability check is required. These materials can be used at any time during a work step. However, the consumption record can be modified or even deleted afterward if necessary.
6.2 Inventory Overview
In the main menu, navigate to MATERIAL→ INVENTORY OVERVIEW.
All the materials that are inventory managed can be found in the inventory overview. The materials are displayed in a list form and can be filtered by different storage locations.
Please ask your supervisor about the app permissions.
The storage locations should be added in the Admin Client by a person who has permissions to modify data there.
The materials are transferred to storage locations with the help of the interface.
You can also display inactive materials by choosing a storage location and clicking the INCLUDED INACTIVE button in the list of inventory overview.
6.3 Material Reservation
There are two types of materials in Workheld Flow: inventory-managed and non-inventory-managed materials. To complete their work, technicians require certain materials, and from the coordinator's perspective, it is important to add materials to the work step. If the material is inventory-managed, it will be reserved for the technician.
The materials' avaliability is calculated based on stock, reservations and deliveries.
Please navigate to OVERVIEW → PROJECT → WORK ORDER and press on materials in order to add materials to work steps.
There is going to be a pop-up which allows you to create a material list. You can see that under each material there is a not whether material is inventory managed or non inventory managed.
In case the materials are available, they can be reserved for the work.
For the materials to be reserved, the start time of the work step must be in the future.
Availability Status has two types:
Available | Not Available |
|---|---|
|
|
Part 7: Masterdata
Part 8: Human Ressources